Following the alternatives evaluation process, two of the five presented alternative designs were eliminated (Alternative B - Road Lane Reduction and Alternative E - Additional Transit Lanes). The remaining three designs were adjusted based on feedback from the community, results of the traffic modeling, conversations with local stakeholders, and better fit within the constraints of the corridor.

Alternative A:


Existing Enhanced

Alternative C:

Public Transit Access Transit Lanes

Alternative D:


Reimagine Washtenaw